GreenlandMines NASDAQ GRMLRare by
nature.
Developing Greenland’s rare earths and precious metals for the industries that depend on them.
GreenlandMines NASDAQ GRMLDeveloping Greenland’s rare earths and precious metals for the industries that depend on them.

GreenlandMinesGreenland / The strategic settingGreenland sits between Europe and North America. Its established security role and mineral potential place it within a shared strategic conversation.
Missile warning, missile defense, and space surveillance: existing missions that illustrate Greenland’s North Atlantic importance.
+The United States, Greenland, and Denmark signed an agreement reinforcing Arctic and North Atlantic cooperation.
+Industrial resilience also depends on resources, processing, and trusted partners.+
Agreement entry into force is subject to national parliamentary procedures. Strategic context does not establish a government award or defense contract for Greenland Mines.
GreenlandMinesRare-earth supply / China · 2024More diverse mineral sources are part of the answer. Resilient supply also requires separation, refining, and magnet manufacturing capacity.
Extracting magnet rare-earth minerals.
Separating and refining them into usable materials.
Manufacturing sintered permanent magnets.
Source: IEA, 2024 data. Mining and refining cover magnet rare earths Nd, Pr, Dy, and Tb. Magnet manufacturing measures sintered permanent magnet production. Each figure measures a separate stage; the percentages are not additive.
GreenlandMinesNorth Atlantic Critical Metals Corridor / Company strategyGreenland’s mineral potential sits between two major industrial markets. The North Atlantic Critical Metals Corridor is Greenland Mines’ strategy for developing that opportunity with trusted partners across Europe and North America, while creating lasting value in Greenland.
Sarfartoq provides the magnet rare-earth resource base; Skaergaard adds palladium, platinum, and gold. Technical programs are focused on resource evaluation, metal recovery, and the studies needed to advance development.
+Neo’s shareholding and retained Sarfartoq offtake rights provide an existing commercial relationship with a European processor. The next work is to establish how future project material can meet processing requirements and agree definitive supply terms.
+Industrial customers need material that meets defined specifications and can be delivered reliably. Product qualification, logistics, and customer agreements are essential to turning a mineral resource into a commercial supply route.
+Infrastructure Technology Capital Greenlandic participation
Development strategy, subject to technical results, approvals, financing, and commercial agreements. Neither project has a production decision; EU Strategic Project status applies to Neo’s Silmet 2.0.
GreenlandMinesThe portfolio / Nasdaq: GRMLA large layered intrusion hosting palladium, gold, and platinum. Historical drilling and the completed 2026 field program support the next phase of resource evaluation and processing studies.
Company interest.
Option for the remaining 20%.
Processing testwork and an Initial Assessment following the completed 2026 field program.1, 2
Neodymium and praseodymium are central to the permanent magnets used in many electric drives and precision systems. Sarfartoq combines a defined rare-earth resource with a strategic relationship with Neo.
Company interest.
Neo’s retained offtake rights apply.
Neo Performance Materials holds offtake rights to up to 60% of future ore or mineral concentrate.3
Decades of geological work. Defined mineral resources.
A focused next phase of technical studies.
GreenlandMinesThe project atlas / GreenlandSarfartoq’s rare-earth carbonatite lies in southwest Greenland. Skaergaard’s palladium–gold–platinum intrusion lies on the southeast coast.
Magnet rare earths in a carbonatite complex. 100% company interest. Neo retains offtake rights.
66.520° N · 51.350° WPalladium, gold, and platinum in a layered intrusion. Greenland Mines holds 80%, with an option for the remaining 20%.
68.182° N · 31.669° W
GreenlandMinesThe work already behind the projectsSuccessive programs have built the geological knowledge that the next phase draws upon.
93 historical diamond drill holes
1989–2021
Early expeditions established a long-running geological research record.
Successive owners added drilling, assays, mapping, and metallurgical studies.
Another 4,480 m in 17 holes, reported after the July resource estimate.
94 holes supporting the
July 2026 ST1 estimate
Geological Survey fieldwork combined mapping with airborne and ground surveys.
Hudson added drilling, sampling, and bench-scale metallurgical work.
Infill drilling and renewed testwork informed the updated resource evaluation.
Sarfartoq’s full project database: 161 holes / 35,843 m. The ST1 estimate uses the 94-hole subset above.
Selected milestones; intervals are not to scale. Historical studies provide context, not current economic conclusions. Resources are not reserves.
GreenlandMines02 / SarfartoqAt 1.60% TREO
+At 0.96% TREO
+ST1 · Hybrid scenario · Effective July 31, 2026.
TREO: total rare-earth oxides.3
Strategic shareholder with rights to up to 60% of future ore or mineral concentrate, creating a potential connection to European processing.3
Geological mapping, outcrop surveys, and rock sampling. Assays were pending at the September 24, 2026 update.4
Planned infill drilling, pilot metallurgy, engineering, and environmental studies will support the work toward pre-feasibility.3
SarfartoqA defined resource. A focused program.
GreenlandMinesSarfartoq / Neo Performance MaterialsGeographic relationship · schematic connection
+Neo is a Greenland Mines shareholder and an established rare-earth processor. Its Silmet facility separates rare earths for downstream use.
Definitive offtake terms, processing compatibility, and future supply remain to be established.
+The plan adapts Neo’s Estonian facility for new raw-material sources. EU Strategic Project status, awarded October 9, 2026, applies to Silmet 2.0. Sarfartoq is a potential future feedstock source.
+
GreenlandMinesSarfartoq / Initial AssessmentThe Initial Assessment models a nine-year operation. Base and high-case sensitivities show the importance of prices, costs, and geological confidence.
| After-tax NPV₈ · US$m | 897 | 1,502 |
|---|---|---|
| Pre-tax IRR | 68.7% | 118.6% |
| After-tax NPV₈ · US$m | 605 | 1,074 |
|---|---|---|
| Pre-tax IRR | 66.0% | 117.5% |
High-case assumptions: prices +15%, operating costs −15%, and capital costs −20% versus base. Low-case pre-tax NPV₈: US$401m including Inferred / US$209m excluding Inferred. NPV is discounted project cash flow, not company value.
Preliminary assessment, not a feasibility study. No mineral reserves. Resources do not demonstrate economic viability. Inferred material has greater geological uncertainty; there is no certainty it will be upgraded or that assessment results will be realized.
GreenlandMinesSarfartoq / Development programA preliminary Initial Assessment and updated resource provide the starting point for the next phase of Sarfartoq’s development studies.
2026 mapping, sampling, and environmental baseline work add to the existing resource record. Infill drilling is planned to improve geological confidence.
+Pilot metallurgical work will evaluate recovery and concentrate characteristics. Those results inform a future processing pathway.
+Engineering, infrastructure, and environmental studies will support work toward pre-feasibility, alongside regulatory and community engagement.
+Resource confidence, recovery, and engineering must be evaluated together. No production decision has been made.
Assays were pending at the September 24, 2026 update. Planned programs remain subject to technical results and approvals.
GreenlandMines01 / SkaergaardA large, layered intrusion with defined palladium, gold, and platinum resources. New field data and recovery studies build on that foundation.
Palladium equivalent
+Palladium equivalent
+100% project basis · Effective July 3, 2026 · 80% company interest.1
| Resource category | Metric tons | PdEq grade | Contained Pd / Au / Pt |
|---|---|---|---|
| Indicated | 153.6 Mt | 3.04 g/t | 7.57 / 3.19 / 0.60 Moz |
| Inferred | 177.5 Mt | 3.07 g/t | 7.75 / 4.28 / 0.60 Moz |
PdEq combines metals using the report’s price and recovery assumptions; it is not palladium alone.
GreenlandMinesSkaergaard / 2026 field programDiamond drilling
Completed holes
Bulk material collected
Assess new drill data alongside the geological model. The July resource estimate predates this field program.
+Bulk material supports recovery testing and flowsheet development, including planned work with GTK in Finland.
+Integrate resource, processing, engineering, and environmental inputs into the next study stage.
+The 2026 program included geotechnical, LiDAR, and geophysical work, and a first environmental baseline field season. Completed fieldwork does not establish a reserve or production decision.
GreenlandMinesMaterials / Industrial applicationsPermanent magnets can deliver compact power in electric motors. Not all electric-drive designs use rare-earth magnets.
Sarfartoq / Magnet rare earthsCatalytic surfaces help convert harmful exhaust gases. This application is associated with combustion engines.
Skaergaard / Palladium & platinumGold-plated contact surfaces resist corrosion in demanding electronic and aircraft connector applications.
Skaergaard / GoldApplication context, including aerospace and defense, not company products, customers, or current supply. Designs and material specifications vary; not all electric motors use rare earths.
GreenlandMinesAnorTech / Strategic equity investmentAnorTech’s Gronne Bjerg project hosts anorthosite, a plagioclase-rich rock being investigated for alumina and other industrial materials.
The additional option was exercised on October 5, 2026. Completion remains subject to exchange acceptance and customary closing conditions. Assets and technology remain with AnorTech.
Laboratory research is moving toward pilot testing. Fifteen metric tons of anorthosite were shipped to Ontario for pilot preparation.
+Research pathways include refractory and printable cement applications. Technical work is needed to establish performance and economics.
+Earth-based simulants and construction-material research extend the material’s testing applications; no lunar deployment is established.
+
GreenlandMinesCorporate platform / CapitalRaised over the preceding week, according to the company’s financing announcement.
Capital raised is not a current cash balance.Exploration, metallurgical, and engineering work across the Greenland portfolio.
+The company stated that financing supports its planned programs and 2027 milestones.
+Blair Jordan and Peter Love joined the board in the September announcement, adding finance and mining experience.
+
GreenlandMinesLeadership / CorporateChief Executive Officer & Chairman
An executive whose experience spans company formation, product development, commercialization, and capital raising. His background is in life sciences and corporate financing. As Chief Executive Officer and Chairman, he leads Greenland Mines' corporate platform alongside its natural-resources team.
President
An economic geologist with more than 20 years in resource development across Europe and the Arctic. His Greenland work began in 1998. A former GEUS senior research scientist and listed-company leader, he brings experience in technical studies, permitting, stakeholder engagement, and European raw-materials policy.
Chief Financial Officer
More than 20 years in financial operations, investing, and business development. His career includes Greenlight Capital, GE Capital, and McKinsey, and co-founding Winvest Acquisition Corp. He holds an MBA from Harvard Business School and a chemical engineering degree from MIT.
GreenlandMinesLeadership / Technical & GreenlandVice President, Exploration
A geologist with more than 25 years of global exploration experience. His work includes Sayona Mining's Authier lithium project and Exeter Resource's Caspiche copper-gold project in Chile. At Skaergaard, he leads technical work supporting resource evaluation and development.
Chief Geologist
An economic geologist whose Aarhus University doctorate studied the Skaergaard intrusion. Formerly a mineral-intelligence leader at GEUS, he combines research on magmatic systems with more than a dozen Greenland field seasons, including exploration work at both Skaergaard and Sarfartoq.
Country Manager, Logistics & Studies
More than 30 years living and working in Greenland. His experience spans Arctic field campaigns, remote camps, infrastructure, and complex logistics. He has coordinated environmental, social, and feasibility studies while working with authorities, consultants, and local stakeholders.
Permitting & Community Manager
A Greenlandic executive based in Nuuk, with experience in logistics, fisheries, mining consultancy, and stakeholder relations. His work connects resource projects with Greenlandic authorities and communities through government liaison, regulatory engagement, and local knowledge.
GreenlandMinesThe next chapterWork completed in the field now feeds the next technical decisions. These are the milestones to follow.
In placeUpdated resource, Initial Assessment, and 2026 fieldwork.
Next catalystsAssay integration, infill drilling, scaled metallurgy, and engineering.
+In place4,480 m of drilling and more than 100 metric tons of bulk samples.
Next catalystsDrill-data evaluation, GTK recovery testwork, and an Initial Assessment.
+In placeSeptember financing and Neo’s strategic relationship.
Next catalystsProgress project programs, processing pathways, and customer qualification.
+Next-stage objectives; completion dates have not been announced. Advancement depends on technical results, approvals, funding, and execution.
GreenlandMinesTechnical notes / Investor informationMineral resources do not demonstrate economic viability. Inferred material has greater geological uncertainty than Indicated material. Categories are reported separately; equivalent-metal figures are not payable metal or production forecasts.
SLR Technical Report Summary, July 13, 2026; resource effective July 3, 2026. Resource figures are on a 100% project basis; company interest is 80% plus an option for the balance. PdEq = Pd + 2.258 × Au + 1.048 × Pt (g/t).
Hybrid open-pit / underground scenario, effective July 31, 2026. GeoSim / Tetra Tech Mineral Resource Estimate. TREO means total rare-earth oxides. Agricola’s 2026 Initial Assessment is preliminary; see its scenarios, assumptions, and cautions.
Future studies, supply arrangements, processing routes, transactions, and production depend on results, approvals, counterparties, market conditions, financing, and execution. No production decision is implied for either principal project.
Gold US$3,500/oz; palladium US$1,725/oz; platinum US$2,100/oz. Recoveries: Au 89%, Pd 86%, Pt 80%; NSR cut-off US$84/t. These assumptions belong to the July resource estimate, not a valuation or price forecast.
Material uses do not establish company products, manufacturers, customers, or government endorsement. AnorTech owns its assets and technology. NASA landscapes are geographic context; company project photos retain their original context.